Planning Temporary Site Power: Generator and Battery Choices

Separate power demand from energy duration, then confirm the electrical and installation requirements with qualified suppliers. A generator badge or battery capacity is not a complete site-power design.

Atlas Copco HiLight V5+ NEO light tower at an outdoor construction site in daylight.

Build a load profile

List connected equipment, voltage, phase, frequency, concurrent demand, starting characteristics and the required operating schedule. Have qualified electrical personnel validate the requirements and protection/distribution arrangement. Average demand alone can miss starting or peak loads that change the equipment choice.

Read generator duty and battery ratings separately

The archived QAS 100 reference distinguishes prime and standby ratings and uses a specific 50 Hz 400 V configuration. The ZBP 45-60 brochure distinguishes rated inverter power from stored energy. Do not combine a standby rating with a prime-duty assumption or treat the 45-60 name as an exact energy value.

Plan charging and integration

A battery needs a defined charging opportunity and compatible source/control arrangement. A generator-battery combination requires supplier-supported integration; two independently suitable units are not automatically a validated system. Account for permitted discharge, conversion losses and actual load variation before estimating runtime.

Check the whole installation and cost case

Enclosure dimensions are not ventilation or service clearances. Obtain exact installation instructions, connections, lifting/transport requirements and battery-health or generator-load-test evidence. Compare hire or ownership with charging, fuel, distribution, maintenance and standby included; no unsupported runtime or fuel saving is promised.

Decision worksheet

Evidence that changes this decision
RequirementEvidence to collectEffect on equipment choice
Electrical demandValidated load and starting profileSelect output and compatible voltage/frequency
Duration and chargingSchedule and confirmed charge sourceSize energy and integration needs
InstallationClearances, distribution and service instructionsInclude more than the enclosure footprint

Before you decide

Questions to close out

  • Have qualified personnel validate the load brief.
  • Keep prime, standby, power and energy separate.
  • Confirm charging/control compatibility.
  • Obtain installation and condition documentation.

Select a supported power system from the load profile and installation requirements, with runtime and cost assumptions visible.